The using of Electronic Load Controller (ELC) to replace governor in Microhydro Power Plant (MHP) can hopefully manage the enormous changing of load by giving a quick system response and lower price than governor. Because of providing power for electricity require high cost and the geographic condition of Indonesia also the unbalance spread of load, so the MHP is the most economic energy resource. MHP is the right plant for providing energy especially for remote area with a low load crowd and far from PLN (Indonesian state electricity company) network.
No comments:
Post a Comment
Thanks for your comments and suggestions
Note: Only a member of this blog may post a comment.