The error often made in the design M.H.P (Micro Hydro Power Electric) is:
- Take a careless flow design through without consideration / calculation of hydrological cycle (region wide catchment rainfall, rainfall, watershed conditions etc.) in the area to be built Micro Hydro Power of Labor (M.H.P), so that the generator does not work optimally or decrease the age (under age design).
- Penstock pipes placed in the area of unstable slopes, especially with the level slope more than 35% (landslide), so that placement in the penstock / analysis to be performed on the anchor structure of the soil strength
- Making buildings intake (dam) that does not take into account / downstream flow of attention to scrape the dam foundation, that can be suddenly forebay (vessel) of water shortages.
No comments:
Post a Comment
Thanks for your comments and suggestions
Note: Only a member of this blog may post a comment.