Bagaimana cara mengelola PLTMH dengan baik?( How to manage the MHP ? )

GTZ-MHPP (Micro Hydro Power Project)
Once a project MHP / Hydro Power was completed, what to do next?
Setelah sebuah proyek PLTMH/Hydro Power selesai dibangun, apa yang harus dilakukan kemudian? agar pembangunan pembangkit listrik tersebut tidak sia-sia atau berumur pendek. Tulisan ini sangat bermanfaat bagi pihak yang sudah atau akan membangun PLTMH, adapun yang akan dijelaskan antara lain :
  1. Apakah PLTMH
  2. Mengapa PLTMH
  3. Kepengurusan untuk pengelolaan listrik
  4. Aturan pengelolaan
  5. Penetapan iuran,
  6. Pemeliharaan
  7. dll

Saturday, October 24, 2009

KERJA KERAS ADALAH ENERGI KITA (Hard work is our energy)


Awalnya kaget melihat tayangan di google adsense diblog saya tentang Pertamina Blog Contest , sungguh sangat menggelitik hati dan akhirnya saya bergabung untuk mengikutinya.

"Kerja keras adalah energi kita", mengandung makna yang dalam tentang etos kerja dan dari kecil kita sudah terbiasa mendengar slogan tersebut lewat berbagai macam istilah yang memiliki nilai rasa hampir sepadan seperti ; “ sedikit-sedikit lama-lama menjadi bukit”, atau “tetesan air pun dapat melubangi batu”, masih banyak lagi slogan serupa yang bisa digali dari khasanah budaya bangsa kita dan ini pula mencerminkan bahwa bangsa kita adalah pekerja keras/pejuang.

Sepanjang hidup saya cukup banyak daerah di Indonesia yang dijelajahi, terutama daerah-daerah terpencil, baru-baru ini saya mengunjungi saudara sebangsa di dekat perbatasan dengan Malaysia , sekitar 3 km dari perbatasan tepatnya di Desa Sungai Antu ( N 00 58’ 53.7” dan E 1110 36’ 28.2”) Kec.Puring Kencana, Kab.Putussibau, Kalimantan Barat. Selama berinteraksi dengan penduduk setempat, cukup membuat hati ini miris melihat kehidupan mereka yang sangat jauh berbeda dengan negeri tetangga, jika di ibaratkan bagai bumi dan langit.

Jangan heran bila masyarakat disana berjuang keras untuk mendapatkan akses ekonomi maupun pendidikan di negeri tetangga dengan cara-cara mereka. Sebagai contoh untuk mendapatkan gas LPG buat memasak mereka harus melintasi perbatasan dengan menghadapi banyak resiko karena produk LPG negeri sendiri masih sulit didapat dan harganya terlalu mahal dibandingkan buatan negeri tetangga. Masyarakat telah bekerja keras untuk memperbaiki kehidupannya, akankah Pertamina mau bekerja keras demi bangsa ini? Kerja keras memang adalah energi yang tak terbatas selama hayat masih dikandung badan dan mampu merubah keadaan yang kadang tidak pernah terbayangkan oleh kita sebelumnya. Tidak ada kata terlambat dalam memperbaiki diri, saya yakin Pertamina dapat segera meraih kejayaan dan mendapat tempat dihati rakyat, karena saat ini banyak rakyat Indonesia sedang menantimu dengan sabar dan penuh harap di tapal batas keputusasaan akan pemenuhan kebutuhan energi dan semoga mereka tak terlalu lama menanti.


Thursday, October 15, 2009

Electronic Load Controller For Microhydro System ( ELC )

This article intended to help people, by presenting a simple, low cost ELC that can be built from easily available components.
Use of ELC in microhydro system can help manage the load change with fast response. it's very similiar to the old mechanical speed governor that acts on a mechanical brake, only that an ELC uses electrical braking : dump loads into which excess electric power can be put. Click here



Wednesday, October 7, 2009

Industrial Biodiesel Plant Design and Engineering ( Practical Experience )

By Dan Anderson , Derek Masterson, Bill McDonald and Larry Sullivan

The biodiesel process itself is more than just a chemical reaction. The practical aspects of how to run an ordinary reaction in to a large full- scale industrial plant are of utmost importance. It has been proven that bench top reactions and equipment often to not properly scale up to full processing plant size, and biodiesel is no exception.

Friday, October 2, 2009

Welded Stell Penstocks (Engineering Monograph)

United States Department Of The Interior Bureau Of Reclamation

THIS MONOGRAPH will assist designers in the solution of problems in design and construction of safe penstocks which may be fabricated in accordance with modern manufacturing procedures. Certain rules relative to materials, stresses, and tests might be considered unnecessarily conservative. Safety is of paramount importance, however, and penstocks designed and constructed according to these rules have given satisfactory service through years of operation.

Welded Steel Penstocks presents information concerning modern design and construction methods for pressure vessels applied to penstocks for hydroelectric power plants. The data are based on some 40 years experience in penstock construction by the Bureau of Reclamation. During this period many of the largest penstocks in service today were designed and constructed.

Click here

Thursday, October 1, 2009

The Errors that often occur in the design M.H.P

The error often made in the design M.H.P (Micro Hydro Power Electric) is:

  1. Take a careless flow design through without consideration / calculation of hydrological cycle (region wide catchment rainfall, rainfall, watershed conditions etc.) in the area to be built Micro Hydro Power of Labor (M.H.P), so that the generator does not work optimally or decrease the age (under age design).

  1. Penstock pipes placed in the area of unstable slopes, especially with the level slope more than 35% (landslide), so that placement in the penstock / analysis to be performed on the anchor structure of the soil strength

  1. Making buildings intake (dam) that does not take into account / downstream flow of attention to scrape the dam foundation, that can be suddenly forebay (vessel) of water shortages.